ICE Bridges

Contractor:
Philipp Holzmann AG, Frankfurt/Germany (Fulda Valley Bridge) / I.G. Müller, Wetzlar (Mülmisch Valley Bridge / Pfieffe Valley Bridge)

Planning time:
1985 (Fulda Valley Bridge) / 1986 – 1987 (Mülmisch Valley Bridge / Pfieffe Valley Bridge)

Construction time:
1986 – 1987 (Fulda Valley Bridge) / 1987 – 1989 (Mülmisch Valley Bridge / Pfieffe Valley Bridge)

Services rendered:
structural engineering (Fulda Valley Bridge) / special design, structural engineering and project management as well as technical consultancy for the site management (Mülmisch Valley Bridge / Pfieffe Valley Bridge)

Engineer of record:
Prof. Dr.-Ing. Hans Georg Reinke (at Harries & Kinkel)

Client:
DB Deutsche Bundesbahn, Frankfurt/Germany

In the course of the construction of a new railway line for the high-speed train ICE, various widespanning bridges had to be built to cross deep river valleys. Due to the speed of the ICE trains these bridges are subject to extreme loads. Special care had to be taken of these loads when engineering the filigree bridges.

The bridges were calculated by Prof. Dr. Hans Georg Reinke during his time at Harries & Kinkel.

 

Related Projects: